Increase in Ore Reserve Estimates

Altura Mining is pleased to announce an increase to the Ore Reserve estimates for its Mt Webber JV DSO Project located in the Pilbara region of WA. The JORC compliant Ore Reserve estimate compiled by Atlas Iron (ASX: AGO) to produce a 57.3% Fe DSO product represents an 18% increase from the previous estimate in August 2011 (see Table 1).

Further details

Posted in 2012 ASX